Market construction
Market construction
sakhtbazar

Plate-bar spacer 60-70/8-24 Beton Parse

Beton Parse
Iran

The load plate is a holding distance with a wide floor (high cross section). It has two different covers that make it very easy to use at the intersection of rebars. This spacer is suitable for soft and collapsible surfaces, insulating walls and ionolite molds.
You can also make a price as a seller
Request a price to negotiate and get a better offer

Suppliers

SuppliersExpiration datePrice (Toman)Minimum order (MOQ)CityPhone number
The price is not recorded

Plate-bar spacer 60-70/8-24 Beton Parse

Spacers are efficient components in the construction industry that, in addition to creating a suitable rebar cover, have many other advantages. Spacers are designed and manufactured in different sizes to create rebar coatings from 15 mm to 150 mm. The most important weakness in a reinforced concrete structure is the corrosion of the rebars. Air, moisture, chlorides, sulfonates, and other environmental corrosive agents can corrode rebar by penetrating into the concrete, which can cause serious damage to the structure. One of the most important factors in preventing concrete corrosion is the creation of a suitable coating on the rebars by the structural conditions and weather conditions. Experience has shown that the use of stone and brick or wooden parts as a distance between the rebar and the concrete surface has never been able to create a suitable and integrated rebar cover on the rebar surface, and in this case, usually due to the non-integration of the cover on the rebar. Where the coverage has decreased due to the unequal size of the supports, the probability of corrosion has increased. Spacers are efficient, cost-effective and lightweight parts that can provide integrated coverage on the rebar surface.

Advantages of using spacers:

Creating integrated coverage on the surface of the armatures
Economical, affordable and cheap
Light weight,. Easy to transport
Accelerate the spacing to cover the rebars
Need less manpower
The speed of execution and therefore the speed of project execution
Complete conflict with concrete due to the presence of hollow cavities in its structure or the lack of rebar displacement due to the presence of locksmiths in the spacers

Technical Specifications

Concrete coating
60-70
Rebar size
24-Aug
Number in the package
250

User's comments and scores