Suppliers | Expiration date | Price (Toman) | Minimum order (MOQ) | City | Phone number |
---|---|---|---|---|---|
The price is not recorded |
The construction of all Pakman hot water steel boilers is based on the design of the German company OMENICAL and in accordance with the BS / 2790-1992 standard and the German DIN and as WET BACK. In general, the boilers are under the practical supervision of the Iranian Quality and Standard Inspection Company During 3 stages of inspection, quality testing and control are performed and the standard quality plate issued 1 month after the preparation of the boiler is presented to the buyer.
In the production of standard steel pots of Pakman Company, in general, the material of the shell, furnace and networks is made of alloy steels for making heat and pressure tanks according to DIN 17 MN4 or ASME A516 / G70 and for the material of pipes or tubes from seamless fireproof pipes. DIN ST35.8 is used.
Pakman Company always gives the right to the buyers to monitor the material of the sheet and electrode used before the construction and during the construction of the boiler, and also does not produce any other boiler without a standard license plate.
The quality and description of the accessories of hot water steel boilers, in turn, are important in the performance as well as the cost of the boiler, which is announced to the buyer at the time of presenting the pre-invoice, description of the equipment with more technical specifications and delivery time.
Pakman Manufacturing and Industrial Company offers all its hot water boilers with a 2-year warranty from the time of delivery and 10 years of technical support services.
Pakman hot water steel boilers, Hedhol, Handel and Manhol valves have been installed in the places with suitable dimensions for inspection, periodic services and even possible replacement of boiler tubes (after a long period of operation).
Before finalizing the order to build or purchase any of the above types of Pakman hot water steel boilers, in addition to paying attention to the capacity and working pressure of the boiler, according to the integrated dimensions of steel boilers and their weight, how to transfer the boiler to the installation site Be careful.
When choosing the required burner for the boiler, it is necessary to select the burner according to the type of fuel available in the project and considering about 20% higher capacity.